Roseburg Oregon VA Hospital
Contractor: Skytek LLC
Owner: Veterans Administration
Three Floors of siesmic upgrade shotcrete shear walls and shotcrete wrapped columns
In addition to the shotcrete placement scope on this project, we performed doweling and epoxying of rebar into the existing structure, form work and rebar placement.
Class A slick trowel finishes at stairwell and columns
Shotcrete Wrapped existing columns. Shear wall stairwell wall in the background
Reinforcement for columns
The existing square columns were changed to a round design. 24 columns in total on 2 floors of the building lined a hall way. We slick trowel finished these as they were to be exposed to persons walking by them
Walls prepped ready for shotcrete
All window block outs, rebar doweling/epoxying and rebar placement performed in house.