Roseburg Oregon VA Hospital

Contractor: Skytek LLC

Owner: Veterans Administration

Three Floors of siesmic upgrade shotcrete shear walls and shotcrete wrapped columns

In addition to the shotcrete placement scope on this project, we performed doweling and epoxying of rebar into the existing structure, form work and rebar placement.

Class A slick trowel finish shotcrete

Class A slick trowel finishes at stairwell and columns

Shotcrete Wrapped existing columns. Shear wall stairwell wall in the background

Shotcrete columns

Reinforcement for columns

The existing square columns were changed to a round design. 24 columns in total on 2 floors of the building lined a hall way. We slick trowel finished these as they were to be exposed to persons walking by them

Walls prepped ready for shotcrete

All window block outs, rebar doweling/epoxying and rebar placement performed in house.